[1]
Untoro, O., Fahma, F. and Sutopo, W. 2021. Risk Management Based on NPV-at-Risk: A Case Study in Floating Solar Power Plant Project. Jurnal Teknik Industri. 22, 2 (Aug. 2021), 245–254. DOI:https://doi.org/10.22219/JTIUMM.Vol22.No2.245-254.