[1]
Sani, I. and Septiropa, Z. 2014. ANALISA BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG. Media Teknik Sipil. 12, 1 (Nov. 2014). DOI:https://doi.org/10.22219/jmts.v12i1.2039.