PRIBADI, R. A.; ABDUH, M. Analisis Cost Performance Index (CPI) dan Schedule Performance Index (SPI) Menggunakan Metode Earned Value (Studi Kasus Pada Proyek Pembangunan Gedung Pasar Bucor Kulon Kabupaten Probolinggo). Media Teknik Sipil, [S. l.], v. 20, n. 1, p. 14–23, 2022. DOI: 10.22219/jmts.v20i1.14620. Disponível em: https://ejournal.umm.ac.id/index.php/jmts/article/view/14620. Acesso em: 23 nov. 2024.