SANI, I.; SEPTIROPA, Z. ANALISA BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG. Media Teknik Sipil, [S. l.], v. 12, n. 1, 2014. DOI: 10.22219/jmts.v12i1.2039. Disponível em: https://ejournal.umm.ac.id/index.php/jmts/article/view/2039. Acesso em: 22 nov. 2024.