Sani, Iktiva, and Zamzami Septiropa. 2014. “ANALISA BIAYA DAN WAKTU DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN HOTEL ASTON PARAMOUNT MALANG”. Media Teknik Sipil 12 (1). https://doi.org/10.22219/jmts.v12i1.2039.