[1]
M. N. Sahid, A. B. Listyawan, M. Solikhin, and S. Masithoh, “Kajian Produktivitas Alat Berat Terhadap Waktu Pelaksanaan Proyek Bendungan Bendo”, JMTS, vol. 19, no. 1, pp. 33–39, May 2021.