1.
Utari RP, Samin, Hadad MN, Wahyudiono S. Analisis Percepatan Proyek dengan Metode Time Cost Trade Off (Studi Kasus Pada Gedung Student Center UIN Datokrama Palu). JMTS [Internet]. 2022 Feb. 28 [cited 2024 Oct. 20];20(1):7-13. Available from: https://ejournal.umm.ac.id/index.php/jmts/article/view/35607