A Feasibility Study on a Micro Hydro Power Plant at Coban Jahe Waterfall, Jabung, Malang Regency
DOI:
https://doi.org/10.22219/jemmme.v6i1.16433Abstract
Micro Hydro Power (MHP) Plant is a small-scale power plant under 100 kW. Generally, MHP is built in a place that the electricity network has not touched. Many waterfalls in Taji Village are only used as tourist attractions. One of them is Coban Jahe waterfall which has a water discharge of 0.60567 m3/s in the dry season. Waterfall in Coban Jahe was used and planned as Micro Hydro Power Plant, it was called as MHP. Potential electric power generated from the MHP Coban Jahe Waterfall is 14.0368 kW with an effective head of 3.4742 m. The results show from the financial analysis, the construction of MHP is quite feasible with NPV of Rp. 45,676,769, BCR of 1.0852, which means it is feasible to be continued, the Payback Period is 9 years which does not exceed the project life, and the IRR obtained is 10,0087% which the projects are feasible and profitable to build.
Downloads
References
Chauhan A, Saini RP. A review on Integrated Renewable Energy System based power generation for stand-alone applications: Configurations, storage options, sizing methodologies and control. Renew Sustain Energy Rev. 2014 Oct;38:99–120.
Penche C. Guide on How to Develop a Small Hydropower Plant. Eur Small Hydropower Assoc. 2004;296.
Firmansyah I, Mahmudsyah S, Yuwono T. Studi Pembangunan Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Dompyong 50kW Di Desa Dompyong, Bendungan, Trenggalek Untuk Mewujudkan Desa Mandiri Energi (DME). Jur Tek Elektro FTI-ITS. 2008;1.
Harto Jawadz UR, Prasetijo H, Purnomo WH. Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Di Aliran Sungai Desa Kejawar Banyumas. Din Rekayasa. 2019 Feb 1;15(1):11.
Marhendi T. Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro Di Sungai Brukah (Kali Bening, Banjarnegara). Techno (Jurnal Fak Tek Univ Muhammadiyah Purwokerto). 2019 Apr 30;20(1):10.
Mantiri HE, Rumbayan M, Mangindaan GMC. Perencanaan Pembangkit Listrik Tenaga Listrik Minihidro Sungai Moayat Desa Kobo Kecil Kota Kotamobagu. J Tek Elektro dan Komput. 2018;7(3):227–38.
Prabowo Y, B S, Nazori N, Gata G. Studi Kelayakan Pembangkit Listrik Tenaga Mikrohidro (Pmlth) Pada Saluran Irigasi Gunung Bunder Pamijahan Bogor. J Ilm FIFO. 2018 Jun 10;10(1):41.
Patel SU, Pakale PN. Study on Power Generation By Using Cross Flow Water Turbine in Micro Hydro Power Plant. Int J Res Eng Technol. 2015;04(05):1–4.
Sallata MK, Nugroho HYSH, Wakka AK. THE UTILIZATION OF MICROHYDRO POWER TO ESTABLISH ENERGY SELF-SUFFICIENT VILLAGE. J Penelit Kehutan Wallacea. 2015 Apr 30;4(1):71.
Saputra AT, Weking AI, Artawijaya IW. Eksperimental Pengaruh Variasi Sudut Ulir Pada Turbin Ulir (Archimedean Screw) Pusat Pembangkit Listrik Tenaga Mikro Hidro Dengan Head Rendah. Maj Ilm Teknol Elektro [Internet]. 2019 May 6;18(1):83. Available from: https://ojs.unud.ac.id/index.php/JTE/article/view/45313
Dwiyanto V, Kusumastuti DI, Tugiono S. Analisis Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Studi Kasus: Sungai Air Anak (Hulu Sungai Way Besai). J Rekayasa Sipil dan Desain. 2016;4(3).
Sukamta S. Studi Analisis Pembangkit Listrik Tenaga Mikrohidro di Kedung Sipingit Desa Kayupuring Kecamatan Petungkriyono Kabupaten Pekalongan. Edu Elektr J. 2018;7(1).
Murni SS, Suryanto A. Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro Menggunakan HOMER (Studi Kasus PLTMH Parakandowo Kabupaten Pekalongan). J List Instrumentasi, dan Elektron Terap. 2020;1(2).
Nasir BA. Design of Micro-Hydro-Electric Power Station. Int J Eng Adv Technol. 2013;2(5):39–47.
Firmansyah R, Utomo T, Purnomo H. Perancangan Pembangkit Listrik Tenaga Mikrohidro Gunung Sawur Unit 3 Lumajang. J Mhs TEUB. 2014;2(7).
Harto Jawadz UR, Prasetijo H, Purnomo WH. Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Di Aliran Sungai Desa Kejawar Banyumas. Din Rekayasa. 2019;
Downloads
Published
How to Cite
Issue
Section
License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution-NonCommercial 4.0 International License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.