Analysis of Production Scheduling In “Abadi” Malang Rackets And Sport Equipment Company

Authors

  • Erika Fera Septiana Universitas Muhammadiyah Malang
  • Nurul Asfiah Universitas Muhammadiyah Malang
  • Kenny Roz Universitas Muhammadiyah Malang

DOI:

https://doi.org/10.22219/jamanika.v1i1.16013

Keywords:

production schedulling, first come first serve (FCFS), shortest processing time (SPT), longest processing time (LPT), earliest due date (EDD)

Abstract

Racket and Sports Equipment Company "Abadi" Malang is engaged in manufacturing. As a result of the covid-19, the company only produces midangan. The purpose of this research is to find out and find the optimal scheduling method so that it can overcome the problem of delays in order completion. The method used is the priority rule consisting of first come first serve (FCFS), shortest processing time (SPT), longest processing time (LPT), and earliest due date (EDD). The results of the study indicate that the SPT method is a method that has the most optimal measure of effectiveness compared to the FCFS, LPT, and EDD methods. The SPT method produces an average value of 21 days of completion, 31.74% utility, an average number of jobs in the system 3.15 jobs, and a delay of 12.5 days.

Downloads

Download data is not yet available.

References

Welding Mesin Erw 2 Di Pt. Xyz. Journal Industrial Servicess, 5(1), 23–29. https://doi.org/10.36055/jiss.v5i1.6495

Haming, M., & Nurnajamuddin, M. (2017). Manajemen Produksi Modern (Edisi Ke 3). Bumi Aksara.

Heizer, J., & Render, B. (2014). Manajemen Operasi. Salemba Empat.

Irvantoro, B. ., & Ellyawati, J. (2012). Penerapan Metode Asas Prioritas Pada Proses Produksi Studi Pada Koperasi Batur Jaya, Kabupaten Klaten, Provinsi Jawa Tengah. Journal, 11.

Jacobs, F. R., & Chase, R. B. (2016). Manajemen Operasi dan Rantai Pasokan. Salemba Empat.

Krajewski, L. J., & Ritzman, L. P. (2005). Operation Management : Processes and Value Chain. Prentice Hall.

Krisnanti, R., & Sudiarso, A. (2012). Penjadwalan Mesin Bertipe Job Shop Untuk Meminimalkan Makespan Dengan Metode Algoritma Genetika (Studi Kasus Pt X). Simposium Nasional RAPI XI FT UMS, 60–65.

Kusumawati, T. I., Sudarmaningtyas, P., & Setyawan, H. B. (2016). Rancang Bangun Aplikasi Penjadwalan Produksi Pada PT Bina Megah Indowood. Jsika, 5(1), 1–5.

Muharni, Y., Febianti, E., & Sofa, N. N. (2019). Minimasi Makespan Pada Penjadwalan Flow Shop Mesin Paralel Produk Steel Bridge B-60 Menggunakan Metode Longest Processing Time Dan Particle Swarm Optimization. Journal Industrial Servicess, 4(2). https://doi.org/10.36055/jiss.v4i2.5154

Safitri. (2019). Analisis Sistem Penjadwalan Produksi Berdasarkan Pesanan Pelanggan dengan Metode FCFS, LPT, SPT dan EDD Pada PD. X. Jurnal Optimasi Teknik Industri, 1(2), 26–30.

Stevenson, W. J., & Chuong, S. C. (2014). MANAJEMEN OPERASI PERSPEKTIF ASIA (Edisi 9). Salemba Empat.

Downloads

Published

2021-03-25

Issue

Section

Articles