ANALISIS PEMETAAN FUNGSI WAKTU PRODUKSI PADA HOME INDUSTRI (COSH MOTOR) JASA PEMBUATAN ONDERDIL MOTOR DI PASURUAN

Authors

  • Siti Rochmaniyah

DOI:

https://doi.org/10.22219/jmb.v7i1.6899

Keywords:

Spare Parts, Wasting Time, Mapping Functions Time, Machine.

Abstract

The research objective was to overcome the problem of wastage of time in the
production processed by planning the mapping function of time for workers and
owners of home industry for the production processed to avoid waste of time and
reduce the damage.The analytical tool used was a function mapping the basis for
knowing which processes were causing wastage of time.
The analysis shows the mapping function of time base production processed it
can be seen, there were four processed were experiencing wastage of time that was
controlling the processed, waiting for turning, waiting for staining, and warehouse,
with two factors, namely the engine and human issues. Of the two factors, the
problem may be known solution was to increase the machine and provide training to
employees to avoid errors in the production processed. In addition to the mapping
function target time in order to indicate whether the implemented solution had
provided an increase in the production processed and the company's operations can
be run effectively and efficiently.

Downloads

Download data is not yet available.

Downloads

Published

2018-10-25

Issue

Section

Articles