ABSTRACT

The processing of lye waste instalation is a processing lye waste leachate discharged into
water bodies do not pollute the environment .Harm caused leachatecan kill the organisms – organisms
if the leachate is discharged directly into water bodies without prior treatment.
Need for storage pondsfor leachate treatment plant, and therefore the capacity to design ponds
need to know how the leachate discharges.Required to discharge leachate storage ponds designed
to meet the volume of pond water leachate.From the analysis of the leachate discharge obtained by
9.43 m3/day. And the production of leachate was 0.8 m3 / day. Levels of waste treatment unit COD
= 8960mg / l and BOD5 = 3968.293 mg / l, after going through the waste treatment plant to be COD
= 298.67 mg / l and BOD5 = 88.18 mg / l. From the processing of these three levels in an already
meets the standard group III cross section pond 03/91.

Keywords : Water leachate , storage ponds , COD and BOD5.

Downloads

Download data is not yet available.

Downloads

Published

2014-03-05

How to Cite

Saleh, C. (2014). STUDI PERENCANAAN INSTALASI PENGOLAHAN LIMBAH LINDI SEBAGAI KONTROL PEMENUHAN BAKU MUTU SESUAI KEPMEN 03/91 (STUDI KASUS PADA TPA SUPIT URANG MALANG). Media Teknik Sipil, 10(2). https://doi.org/10.22219/jmts.v10i2.1782

Issue

Section

Articles