Analisis Perbandingan Pada Penjadwalan Job Untuk Ketepatan Waktu Proses

Authors

  • Pipit Sari Puspita

DOI:

https://doi.org/10.22219/JTIUMM.Vol8.No1.12-22

Keywords:

job scheduling, makespan, mean tardiness, idle time

Abstract

Almost most of company operates based on request (order). The aim of company in industry world is get to complete the customer needs that are the high quality of goods, cheap goods price or finish and delivery product on time. To realize the mention the company must compose production planning hooked on scheduling of production. The scheduling in problems right now, there are excessively long delivery times and the large of total idle time. The Problems cause the height of production cost in company. To overcome the mention will conduct an approach of method that able to give job schedule more precise. The methods are Algorithm Heuristic Dispatching Rule Last Come First Serve, Algorithm Heuristic Dispatching Rule Shortest Processing Time, Algorithm Heuristic Dispatching Rule Longest Processing Time, Algorithm Heuristic Dispatching Rule Earliest Due Date, Algorithm Heuristic Dispatching Rule Slack Time, which one of the method will choose with criteria like minimize makespan, mean tardiness and total of idle time. So is obtained result of new method which give minimize of the criteria is Algorithm Heuristic Dispatching Rule Last Come First Serve for September 2007. With this method company can economize process time (makespan) 2 hours, mean tardiness 3,13 hours and total of idle time 26 hours. For October 2007 obtained new method which give minimize of the criteria is Algorithm Heuristic Dispatching Rule Longest Processing Time. With this method company can economize process time (makespan) 1,5 hours and total of idle time 19,5 hours.

Downloads

Download data is not yet available.

References

Baker, Kenneth R., 1984, Intoduction to Squencing and Scheduling I, John Wiley and Sons, New York.

Elwood S, Buffa dan Rakesh K., Sarin. 1997, Managemen Produksi dan Operasi Modern, BpFE, Yogyakarta herjanto, Eddy, 1999, Manajemen Produksi dan Operasi, pT. Gramedia, Jakarta.

Morton, Thomas E and pentico, David W., 1993, Heuristic Scheduling Systems, John Wiley and Sons, New York.

Nasution, Arman hakim, 1999, Perencanaan dan Pengendalian Produksi, Guna Widya, Surabaya.

panggabean, henry pantas, 2002, Penjadwalan Job Shop Statik dengan Algoritma Simulated Annealing.

Reksohadiprodjo, Soekanto dan Gito S. Indriyo, 1988,

Management Produksi, BpFE, Yogyakarta. Render, Barry dan heyzer, Jay, 2002, Prinsip-prinsip

Managemen Operasi. BpFE. Yogyakarta.

henry, 2002, Penelitian Mandiri Penjadwalan job shop dalam Meminimasi Waktu Produksi.

Downloads

Published

02/26/2008

How to Cite

Puspita, P. S. (2008). Analisis Perbandingan Pada Penjadwalan Job Untuk Ketepatan Waktu Proses. Jurnal Teknik Industri, 8(1), 12–22. https://doi.org/10.22219/JTIUMM.Vol8.No1.12-22

Issue

Section

Article