Perancangan Fasilitas Pabrik Tahu untuk Meminimalisasi Material Handling

Authors

  • Merry Siska
  • H Henriadi

DOI:

https://doi.org/10.22219/JTIUMM.Vol13.No2.133-141

Keywords:

material handling, layout of plant facilities, Systematic layout planning, 5S Method

Abstract

UD. Dhika Putra is a tahu manufacturing company. Currently, the company is having some problems in production facility layout and physical environment. This study aimed to redesign the facility layout of tahu manufacturing company to minimize the path length of material handling and apply the 55 method to enhance work productivity. The approach used to redesign the plant facility layout is Systematic Layout Planning (SLP), which can be categorized in three stages, namely material flow analysis, research, and selection. While the 55 method consist of several steps to organize workplace condition that affect on the effectiveness, eficiency, productivity, and safety. This study concluded that the chosen layout for the final layout showed a significant decrease in path length of material handling, i.e 45 meters or about 19,2%. The decreasing of material handling path length on the choosen layout was also influenced by the arrangement of the work place by using 55 method. 

Downloads

Download data is not yet available.

Author Biographies

Merry Siska

Teknik Industri, Fakultas Sains dan Teknologi, UIN Sultan Syarif Kasim Riau, Pekanbaru
Laman: merrysiska@yahoo.com

H Henriadi

Teknik Industri, Fakultas Sains dan Teknologi, UIN Sultan Syarif Kasim Riau, Pekanbaru
Laman: merrysiska@yahoo.com

Downloads

Published

12/28/2012

How to Cite

Siska, M., & Henriadi, H. (2012). Perancangan Fasilitas Pabrik Tahu untuk Meminimalisasi Material Handling. Jurnal Teknik Industri, 13(2), 133–141. https://doi.org/10.22219/JTIUMM.Vol13.No2.133-141

Issue

Section

Article