Penjadualan Produksi Melalui Sistem Produksi Just In Time dengan Kaban Guna Memenuhi Permintaan

Authors

  • Eti Kristinawati

DOI:

https://doi.org/10.22219/JTIUMM.Vol2.No2.138-146

Keywords:

JIT, Production Schedule, Kanban

Abstract

JustI n Timep roductions ystemis a productions ystemw hichp roducea productw hent hey
are neededa nd a fit numbero f productt o achievet he consument'sd emand.T o make the
productionp rocessru n well so it mustb e made a plana nd scheduleo f goodp roductionp rocess
rangkingw hich is approachw ith the demandc ondition.
CV. SugrhW arasi s a furniturec ompanyw hich has a demando f producti ncreaseT. his
problemw ill maket he companyh ast roublet o achievei t. JIT productions ystemw ith using a
scheduleo f productiona nd kanbanb ecomea problems olvinga lternetiveto solvet he customer
demandp roblemF. rom the analysisw e shownt hat usingJ IT problems ystemc anr educeth e back
ordero fproductr esult.T hep rofit canb e reachedb eforei mplemenJt IT is Rp 253.236.000,0a0n d
afteri mplemenJt IT isRp 289.803.000,0s0o t hati ncreasea bout Rp 36.567.000,O0or1 4.44yo.

Downloads

Download data is not yet available.

Downloads

Published

04/29/2010

How to Cite

Kristinawati, E. (2010). Penjadualan Produksi Melalui Sistem Produksi Just In Time dengan Kaban Guna Memenuhi Permintaan. Jurnal Teknik Industri, 2(2), 138–146. https://doi.org/10.22219/JTIUMM.Vol2.No2.138-146

Issue

Section

Article