Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning

Authors

  • Ayudina Puji Estrimaz
  • Rudy Hendrawanto

DOI:

https://doi.org/10.22219/JTIUMM.Vol2.No1.27-35

Keywords:

Forecasting, Master Production Schedule, Material Requirement planning, UMM

Abstract

PT. Kuda Laut Mass is a private company which produce floor tile. The problem that usually happen in this company is how to make planning in material requirement especially count the quantity of material and component and also release that will ber educe the production cost.

Downloads

Download data is not yet available.

Downloads

How to Cite

Estrimaz, A. P., & Hendrawanto, R. (2010). Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning. Jurnal Teknik Industri, 2(1), 27–35. https://doi.org/10.22219/JTIUMM.Vol2.No1.27-35

Issue

Section

Article