Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning
DOI:
https://doi.org/10.22219/JTIUMM.Vol2.No1.27-35Keywords:
Forecasting, Master Production Schedule, Material Requirement planning, UMMAbstract
PT. Kuda Laut Mass is a private company which produce floor tile. The problem that usually happen in this company is how to make planning in material requirement especially count the quantity of material and component and also release that will ber educe the production cost.Downloads
Download data is not yet available.
Downloads
How to Cite
Estrimaz, A. P., & Hendrawanto, R. (2010). Perencanaan Kebutuhan Bahan Baku Keramik BHL244S dan HM-2 dengan Metode Material Requirement Planning. Jurnal Teknik Industri, 2(1), 27–35. https://doi.org/10.22219/JTIUMM.Vol2.No1.27-35
Issue
Section
Article