Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time
DOI:
https://doi.org/10.22219/JTIUMM.Vol2.No1.19-26Keywords:
Product Scheduling, Total Job Time Minimation, UMMAbstract
Product scheduling system that used by PT Berjaya Sekawanindo for this time, only concidering one purpose criteria for product scheduling is how to finishing all of demand fastest. With only concidering one urpose criteria, cause there are another criterias which neglectfully.Downloads
Download data is not yet available.
Downloads
How to Cite
Purwatiningsih, D. R., & Khusnita, H. (2010). Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time. Jurnal Teknik Industri, 2(1), 19–26. https://doi.org/10.22219/JTIUMM.Vol2.No1.19-26