Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time

Authors

  • Dyah Retno Purwatiningsih
  • Hima Khusnita

DOI:

https://doi.org/10.22219/JTIUMM.Vol2.No1.19-26

Keywords:

Product Scheduling, Total Job Time Minimation, UMM

Abstract

Product scheduling system that used by PT Berjaya Sekawanindo for this time, only concidering one purpose criteria for product scheduling is how to finishing all of demand fastest. With only concidering one urpose criteria, cause there are another criterias which neglectfully.

Downloads

Download data is not yet available.

Downloads

How to Cite

Purwatiningsih, D. R., & Khusnita, H. (2010). Penjadwalan Produksi dengan Metode Johnson dan Heuristic untuk Meminimasi Makespan, Total Flow Time, serta Idle Time. Jurnal Teknik Industri, 2(1), 19–26. https://doi.org/10.22219/JTIUMM.Vol2.No1.19-26