Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
DOI:
https://doi.org/10.22219/JTIUMM.Vol3.No1.55-65Keywords:
Production System, Schedulling and Reschedulling SPT, Makespan, UMMAbstract
To complete customer's demand so company must make a plan with using production schedule. Some diffrculties usually happen in shop floor level is a new job which is put in a production schedule that have arranged before. So that the old production schedule have to revised by reschedulling. The procedure that be used to schedule the real time production consist of n job m machine is algoritm of Hueristik Dispatching Rule Shorted Processing Time (SPT) method to minimize mean tardiness and makespan.Downloads
Download data is not yet available.
Downloads
How to Cite
Kristinawati, E. (2010). Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan. Jurnal Teknik Industri, 3(1), 55–65. https://doi.org/10.22219/JTIUMM.Vol3.No1.55-65
Issue
Section
Article