Perbandingan Performasi Metode Johnson dengan Heuristik Multi Tujuan Ditinjau dari Makespan Total Flow Time dan Iddle Time
DOI:
https://doi.org/10.22219/JTIUMM.Vol3.No2.163-172Keywords:
Pdormance, Makespan, Flow timeAbstract
This researchtd es to implementa methodo f rnachines chedulingfo r flow shopc alledMulti ObjectiveH euristicT. o makee asiera pplicationin attainingjo b sequencteh atm achinem ust
do alongw ith makespavna lue,l otal flow time, andi dle time,t hen a softwareis made Next, we
makea iomparisono f machines chedulingre sultp erformancbee tweenM ulti objectiveH euristic
Methoda ndl ohnsonM ethodi f viewedf iom makespavna lue,t otalf low time,a ndi dlet ime. From
the resulto f researchc oncludedth at heuristic with multi objectivesm ethods howst he solutions
flow timet otalf ewert hanJ ohnsonm ethod
Downloads
Download data is not yet available.
Downloads
How to Cite
Garside, A. K. (2010). Perbandingan Performasi Metode Johnson dengan Heuristik Multi Tujuan Ditinjau dari Makespan Total Flow Time dan Iddle Time. Jurnal Teknik Industri, 3(2), 163–172. https://doi.org/10.22219/JTIUMM.Vol3.No2.163-172
Issue
Section
Article