Penentuan Interval Waktu Penggantian Komponen Kritis Pada Mesin Volpack Menggunakan Metode Age Replacement

Authors

  • Yanuar Yuda Prawiro

DOI:

https://doi.org/10.22219/JTIUMM.Vol16.No2.92-100

Keywords:

Replacement, Downtime, Preventive, Age Replacement

Abstract

CV. Cool Clean is a company engaged in packing tissue. During this time the company only perform corrective action that causes disruption of the production process due to frequent damage of a sudden the engine components volpack. In this study used a model of preventive replacement that can reduce downtime and costs. The method used to obtain the schedule interval a critical component is age replacement method. Seal heater obtained replacement time interval of 30 days with a 22% reduction in downtime. Replacement interval for knife foil is 26 days with a 27% reduction in downtime. Replacement interval for solenoid valve is30 days with a 29% reduction in downtime. Replacement interval forOring seal is 18 days with a 29% reduction in downtime. Replacement interval for needle bearing is 62 days with a 25% reduction in downtime. Results of this study also showed that by applying age replacement can save costs for seal heater Rp. 974.000 or 23%. Knife foil cost savings of Rp. 1.251.409 or 22%. Solenoid valve cost savings of Rp.546.539 or 24%. Oring seal cost savings of Rp. 350.096 or 26%. And needle bearing cost savings of Rp. 196.712 or 26%.

Downloads

Download data is not yet available.

References

S. Assauri, "Manajemen Produksi dan Operasi Edisi Revisi, lembaga penerbit Fakultas Ekonomi Universitas Indonesia, Jakarta," 2004.

A. K. Jardine and A. H. Tsang, Maintenance, replacement, and reliability: theory and applications: CRC press, 2013.

J. Xinjian, W. Gong, S. Jianming, and Z. Mengying, "Group maintenance policy for mechanical products based on age replacement," 2015.

Y.-L. Chen, "Optimization of age replacement policy for aging multi-state system with imperfect maintenance," in Proceedings of the 2014 International Conference on Education Reform and Modern Management. Atlantis Press, Paris Google Scholar, 2014.

T. Nakagawa and X. Zhao, "Age Replacement Overtime," in Maintenance Overtime Policies in Reliability Theory, ed: Springer, 2015, pp. 1-31.

M. Park, K. M. Jung, and D. H. Park, "Optimal age replacement policy with replacement occurrence while the warranty is in effect," Journal of Shanghai Jiaotong University (Science), vol. 20, pp. 374-379, 2015.

A. Christer, "Operational research applied to industrial maintenance and replacement," Eglese, Rand, pp. 31-58, 2014.

C.-C. Chang, "Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair," Computers & Industrial Engineering, vol. 67, pp. 185-194, 2014.

C. Coleman, J. Kiel, K. Davis, A. Mitola, and L. Arterburn, "Gender and Age Differences in the Effectiveness of the Medifast 4 & 2 & 1 Meal Replacement (MR) Plan for Weight Loss in Overweight and Obese Adults: A Retrospective Chart Review of 21 Medifast Weight Control Centers," The FASEB Journal, vol. 29, p. LB230, 2015.

Y.-H. Chien, F.-M. Chang, and T.-H. Liu, "The Effects of Salvage Value on the Age-Replacement Policy under Renewing Warranty," in Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January, 2014, pp. 7-9.

Downloads

How to Cite

Prawiro, Y. Y. (2017). Penentuan Interval Waktu Penggantian Komponen Kritis Pada Mesin Volpack Menggunakan Metode Age Replacement. Jurnal Teknik Industri, 16(2), 92–100. https://doi.org/10.22219/JTIUMM.Vol16.No2.92-100

Issue

Section

Article